Tashlykskaya Pumped Storage Plant
Projection of the Waterworks construction, underground operations technology and organization.

Projection of the thin-walled lining structures with the exception of the lining metal  on the output sector of pressure (turbine) conduits. Development of organizational and technological scheme of the pressure conduits  using mining equipment.

1983-1998.

Underground structures of various application, Chief Project Engineer  - L. Levin.