Miatlinskaya Hydro Power Plant on the Sulak river
Hydraulic engineering works
Underground structures of various application, Chief Project Engineer - M. Bikineev.
Projection of the waterworks underground structures building organization and technology, lead excavations construction development.
Development of organizational and technological solutions for the construction of the mine equalizing reservoir using self-propelled mining equipment and vehicles.
1975 - 1987.