Vladivostokskaya Thermal Power Plant-2
Projection of the pressure water supply tunnel number 1, 2 and 3.
Projection of the tunnels construction, underground operations oraganization and technology (in urban areas).
1975 - 1981, 2001 - 2002.
Underground structures of various application, Chief Project Engineer - E. Ryzhankov.